All containers should be loaded no higher than level with the top of the container. In some cases, where brick, concrete, roofing, or other dense material is being loaded into a 30 or 40 Yard container, it may be necessary to load the container no more than ¾ of the designed capacity. Overloading of a container may result in additional charges.